RAC Grup

RAC GRUP • GIRESUN • EUROPE

Remote Renovation Management in Giresun

Manage renovation through a site survey, written scope, product approvals, budget controls, progress evidence and a documented handover.

Survey the existing building

Moisture, cracks, services, roof condition, dimensions and structural concerns are reviewed on site. Assumptions about concealed defects are stated clearly.

Approve products by specification

Tiles, paint, doors, electrical and plumbing products are approved by brand, model or technical performance. Substitutions require written approval.

Close with a snagging list

Each work package is checked before closure. Outstanding items, cleaning, keys and warranty documents form part of the recorded handover.