Verify land, design and responsibilities
Title, planning status, survey, soil information, permits and current drawings are checked before work starts. Authorisation and approval responsibilities are recorded in writing.
Control cost by work package
Scope, assumptions, exclusions, payment milestones and variations are itemised. A reliable final price requires a site visit and coordinated construction documents.
Evidence-based progress reporting
Key stages are documented with dated photographs, video, measured progress and short explanations. Remote coordination does not replace licensed technical supervision or statutory approvals.